Cement self-leveling construction process the matters needing attention
1,environment construction temperature to 15-25 ℃ advisable.
2,the basic unit should meet:C20 above,no rise sand,empty drum,the shell,grease,crack defects,etc.
The moisture content is not more than 6%.
Three,the construction site doors and Windows can be closed,construction process does not drafts,no direct sunlight.
4,interface agent completely dry again self-leveling construction.
5,cement self-leveling must use mechanical agitation.