英语翻译风管板材拼接的咬口缝应错开,不得有十字形拼接缝,法兰材料规格与管径配套,中低压风管的螺栓及铆钉的孔距不得大于15
1个回答

Air hose plate splicing nips the mouth seam to be supposed to stagger,must not have the cruciform to put together the joint,the flange material specification and the caliber necessary,the mesolow air hose bolt and the rivet pitch of holes does not have to be bigger than the 150mm high tension system air hose not to have to be bigger than 100mm.The rectangular air hose flange four jiao spots should be equipped with the spiral hole

air hose reinforcement condition:The circular φ≥8) Omm,manages section chief >1250mm,or surface area >4m2; Rectangular pipe length of side >630mm heat preservation air hose >800mm,manages section chief >1250mm,low pressure air hose unilateral even area >1.2m2,high-pressured >1.0 mZ:The non-gauge outer tube conforms to the requirement

according to the pipe tee T air hose reinforcement form,gawks the muscle or gawks the line reinforcement arrangement rule,the gap is even,the pan is smooth; The angle steel,the reinforcement muscle reinforcement arrangement is neat,even symmetrical,is not bigger than the flange altitude highly,is reliable with the air hose riveted joint,the gap (is not bigger than 220mm) evenly,intersect point Lian Cheng a body; Supports reliably,supports a between spacing to be even,also is not bigger than 950mm; The mesohigh systematic section is bigger than when 100mm adds the frame,nips the mouth seam to have guards against the expansion crack reinforcement measure