英语翻译本项目的空压机集中布置,考虑到粉煤灰输送耗气量较大,粉煤灰卸船及输送入库,需要80Nm3/min压缩空气.把粉煤
1个回答

Layout of the project focused on air compressor, air consumption taking into account the large fly ash transportation, unloading and transportation of fly ash storage needs 80Nm3/min compressed air. The end of the fly ash into the ingredients from the store warehouse, about 36Nm3/min compressed air purge required 36Nm3/min, frequency of use less. Therefore, on the arrangements for transportation of fly ash with a prepared set of 3 40Nm3/min, 0.8MPa air compressor. The production line, the dust collector, pneumatic components, such as gas consumption is about blowing ring 26Nm3/min. To meet production needs, it chose a 30Nm3/min, 0.8MPa air compressor. Because it is centralized arrangement, transport of spare air compressor fly ash can also supply spare in production. Second part of the compressed air requires filtration, dried.