From October 1, 1964 Japan's first high speed railroad traffic so far, after forty DuoNian development, high-speed rail with its rapid, safe, economic and environmental protection, and other aspects of the obvious advantages. At present in the world scope of high speed railway construction is in the ascendant, technological progress is more with each passing day. High speed railway passenger special line that is required GaoPingShun sex and high stability of the rail, stable, settlement and settlement of small even smooth GaoPingShun sex is the track of subgrade foundation. And the stability of roadbed, main is to rely on good roadbed post-construction settlement and the uneven settlement to control. Our homeland is a large country, topography and geology condition is very complex, and there are a lot with special material composition and structure, and engineering geological properties of a special soil. Embankment is the foundation of the railway and highway, must have the enough strength and stability, and so on through the special land area with high quality requirement of roadbed. Only in the bounderies stratum situation, make sure foundation conditions can be conducted only meet the requirements of the filling the road embankment, or should be for reinforcement. This paper mainly introduces the long period of special passenger line guizhou soil subgrade construction technology research, with soft soil, soft soil and the red clay primarily. No zha rail area all soil foundation are subject to an stability and post-construction settlement analysis, post-construction settlement must meet the requirements specification. When the subgrade stability, post-construction settlement or post-construction settlement difference value is not satisfy the standard requirement, the need of foundation reinforcement. Reinforcement measures mainly has WaChu change fill, mixing pile, water soil learn a lot from mixing pile, CFG pile and high pressure jet grouting pile, prefabricated concrete pile, fill preloading method, this paper make a list of various methods, the applicable condition, the construction preparation, technical requirements, quality control and quality inspection, the points for attention, etc. And through various subgrade treatment method of the applicable condition, the condition, advantages and disadvantages, the comparison of the final CFG pile, and the advantage in the long period of special guest designed guizhou soil subgrade construction, is widely used in the most economic and reasonable construction technology of one.
最新问答: 急求描写古代场景的句子!不要诗句,不要文言.我现在非常需要,我要参考.宫廷、江湖、酒楼、青楼、舞林大会、赏花节.等等各类 5L的油不等于10斤?假设你是做预订服务的,该怎么跟你的用户说明5L油不等于10斤?(注意服务用语)!有些人就是喜欢这么 在线等 若函数y=f(x)满足f(x)=f(1/x)lgx+1,求f(10)的值 核电厂是吧原子能转化成了电能. 一个梯形被对角线分割(分成四个三角形),已知两个相邻三角形的面积是12,6,求另两个三角形面积? 全球每年火山爆发的次数 夏之热烈在于山坡上的芊芊细草长成了一片密密的厚发.请仿照例句,再写两个句子. He waited for a short time before he got on a crowded bus .H send的第三人称单数是什么?send的三单形式 粮库里有1000吨大米,第一次取出它的二分之一,第二次取出余下的三分之一,第三次取出余下的四分之一, x的三次方加y的三次方等于多少? 西方文化中“火”与“水”各象征着什么 硫酸会腐蚀玻璃么?为什么? 任何进位计算制都有的两要素是() A 整数 B 定点数和浮点数 C 数码的个数和进位基数 D阶码和尾码 答案是C ,为什 正比例函数基本形式是什么拜托了各位 最大的3位数除以最大的三位数商是多少? 选字填空。澡 躁 燥 噪1.我要你们洗( ),爱清洁。2.听了这话,他心中顿时( )起来,坐立不安。3. 设函数f(x)在(-∞,+∞)上连续,且f(x)=e^x+1/e∫(0,1)f(x)dx,求f(x) 行政管理方面英语作文作文题目Career planing 字数500字 好读的 急用 快快 有另谢 一项工程,甲单独做12小时完成,已单独做15小时.甲已一起工作1小时,甲再工作1小时,已再工作1小时,甲已这样下去完成这