With the year of 2007 approaching, good news came from the construction sites of the Olympic projects -- the membrane structure of the outside layer of the National Aquatics Center was completed on the morning of December 26.
Construction of the landmark project, also called the "Water Cube," officially started on December 24, 2003. The work on concrete and steel structures was finished in July 2006. On August 1 this year, installation of cushions of membrane structure was officially launched.
With the closure of the outside membrane layer project, the installation of inside cushions will be under way, in a synchronized manner with the indoor fit-up and decoration. Installation of electromechanical equipment and pipes is currently going on and indoor fit-up and decoration will start by the end of the year. The whole project will be completed at the end of 2007.
In accordance with the plan, the venue test event will be launched at the National Aquatics Center in February 2008.
The material of membrane structure is called ETFE, or ethylene-tetra-fluoro-ethylene, used for the first time in China. It is also the largest and most complicated membrane system in a single building project internationally. The construction staff of the National Aquatics Center completed all works and fulfilled the goal as planned after overcoming many difficulties, successfully carrying out membrane structure research and independent innovative construction practice.
2.It looks blue, but it's green, and it's here. As big, eye-catching Olympics architecture goes, nothing may be as sustainable as the Beijing National Aquatics Center, or Water Cube, the latest cutting-edge building to open on the enormous construction site that is China. Taking the structure of soap bubbles as inspiration (and mimicking nature's way of filling 3-d space most efficiently), PTW Architects and Arup gave the $200 million Cube an elegant, light-weight design: a rectangular box covered in iridescent bubble wrap.
But it does more than look cool. The 100,000 square meters of the Teflon-like translucent plastic ETFE that make up the building's bubble cladding allow in more solar heat than glass, making it easier to heat the building, and resulting in a 30 percent reduction in energy costs. That's especially important for a swimming pool, which requires an enormous amount of heating. (Though the building's ETFE was manufactured abroad, meaning more pollution in construction than would there have been with locally available materials, designers emphasize that the energy savings are substantial, equivalent to covering the roof in solar panels.
-
点赞数:0回答数:1
-
点赞数:0回答数:5
-
点赞数:0回答数:1
-
点赞数:0回答数:1
-
点赞数:0回答数:1
-
点赞数:0回答数:1
-
点赞数:0回答数:1
-
点赞数:0回答数:1
-
点赞数:0回答数:1
-
点赞数:0回答数:1

最新问答: UV2450紫外的比色皿是什么型号的? 词语填空( )光( )色 回答别人道歉的用语(英语) 食盐是晶体吗? 两个数的最大公因数是15,最小公倍数是360,且两数相差75,求这两个数 谁有《放言五首》的译文?要全面点 自己写形容老师的诗歌(表达对老师的感激之情以及不舍得心情)!! 一定要自编,否则不给分哟!! 平行四边形的四个角都是直角.______. 一切有为法,如梦幻泡影,如露亦如电,应作如是观.金刚经上说:凡所有相,皆是虚妄. 如图所示的四种情景中,属于光的折射现象的是( ) 表示日的诗 化学中的ccl 4是什么 《藤野先生》6~9段的阅读答案. The house _____is very old.( ) (选出错误的一项) 求一篇关于保护野生动物的英语作文,其中要提及到一种频临灭种的动物,字数在100字左右 钢筋混凝土受弯构件的截面有效高度就是截面高度减去保护层厚度? 为啥硫代硫酸钠标准溶液要静置2周再标定?,GB/T 601 萝卜的体细胞内有9对染色体,白菜的体细胞有9对染色体,现将 下列划线的词释义不完全正确的一组是( ) 400×(1-20%)×(1+20%)简算谢谢小学六年级
相关问答: 英语