Abstract: With the high-grade highway construction the continuous development of road machinery demands more and more high, mechanical equipment are the efficient management and engineering decide the quality of the project a necessary condition for effectiveness, so strengthening the management of engineering machinery and equipment, so scientific management, rational use, timely maintenance, repair, as appropriate, economic accounting, in order to better highway engineering construction services, access to equipment management best value for money. In this paper, equipment management in highway engineering analysis, the existence problem for some of the views put forward their own. Keywords: road construction machinery and equipment cost-effective management of technical measures 1 Device Manager Problems Bidding system and project the Ministry of the system are under market economy conditions highway construction market development, product, project subordinate non-permanent body, it was decided that the management of mechanical equipment, there are many questions. 1.1 Construction of equipment that does not support After the successful incorporation of the project engineering department, drawn from the project department of machinery and equipment are mostly poor technical condition, the injection of new highway projects, will inevitably affect the project progress and quality. And some major road works or special equipment not in place, equipment not supporting the same is a difficult problem. 1.2 Project Department of Equipment Management serious short-term behavior Projects pursued by the Department are the quality of the project, project progress and effectiveness. The use of machinery is of course the sooner the better, but because of the outside world by various factors, has to work overtime, work overload Long time, this "weight management, light use of" directly affect the mechanical behavior of the technical status and life. As for the failure of the course of construction machinery, especially large-scale machinery, project department are unwilling to bear the high cost of repair, but only by a project department also is not quite reasonable to assume. 1.3 Mechanical management and production management contradictions exist Mainly road and bridge projects to technical staff, machinery managers often do not project or not project an important component of the Department staff and production managers use as a machinery management layman, on the proper use of machinery, regular maintenance, such as knowledge may want to common sense, and the operator of the construction technology know very little about, often in a passive construction or dominance, so that management has been greatly weakened machinery. 2 device management measures 2.1 and actively made the organization of equipment Project set up the equipment should be immediately set up the project organization and management system, according to the size of the project organization plans to do a good job to determine the mechanical type, quantity and leading machinery, layout of all into the game plan and the total mechanical control, and timely reporting of organizations to plan, organize machinery in place and better understanding about the state of mechanical technology, to replace the inferior machinery, for highway projects successfully carried out to prepare. 2.2 to do a good job of checking all equipment, maintenance, debugging job (1) do a good job of preventive maintenance. The operation of all machinery arrived at the scene to conduct a comprehensive start-up inspection, and manipulator of organizations to carry out routine maintenance of machinery and equipment, including three filter inspection, added grease, fastening bolts and check the oil level of pollution. For the existence of the mechanical problem should be the preparation of a reasonable repair plan and immediately implemented. (2) of newly purchased machinery to the selection of high quality and a strong sense of responsibility of personnel, coordinated the installation of equipment for the factory to do a good job debugging manipulator and the implementation of pre-job training, master rules, skilled technique before on machines work properly. 3 Construction Machinery Management (1) project department want detailed arrangements, good equipment, the work of the Organization, timely deployment of equipment. (2) The operator should be subordinated to the project arrangements, but also combined with the local situation, as appropriate, homework. (3) The operator must be strictly in accordance with the rules at any time to observe the dynamics of the situation of equipment, and remove any hidden dangers and put an end to such issues as a result of oil and water affect the normal operation. (4) The operator must be strictly enforced mechanical maintenance system in order to avoid outdated maintenance, so that mechanical work to maintain good status. On the utilization of high and easy to damage, failure of equipment easy to do a good job tracking the diagnosis should be changed after the repair to preventive repair. Mechanical anomaly happened to be immediately shutdown checks, and timely reporting to the leadership, organizational maintenance personnel to quickly repair site. (5) mechanical wearing parts should be ready reserves to avoid the cycle is too long to buy pieces of the impact of highway construction. (6) of the gap leasing machinery should be carried out to ensure that highway projects on schedule. Machinery Leasing should do a good job in market research, efforts to reduce leasing costs. 4 mechanical maintenance fund set up to strengthen the machinery and equipment costing (1) the establishment of mechanical repair funds, the implementation of earmarked projects can effectively resolve the Department's short-term behavior. Mechanical maintenance fund can be extracted from the project department, the ratio can be based on a project size or effectiveness of the case may be; (2) cost accounting to deal with fuel, lubricants and maintenance fees to implement a single registration at any time to complete units of equipment production, power requirements, and other miscellaneous fittings consumption expenditure and so on. Record a sound use of mechanical equipment for operation of Units classes, Units, completion of production, fuel, spare parts consumption prepare basic data collection, monthly summary and an analysis of the effects on the use of evaluation to the target machine to use technology to compare and adjust . 5 Concluding remarks Projects to strengthen the equipment of the optimal allocation of factors of production, the use of management, cost accounting, on the one hand, can be coordinated, the organic combination of a common highway engineering projects achieve the expected goal. On the other hand can contribute to mechanical equipment and highway projects, the two common improve management effectiveness, this project is to strengthen the road construction equipment, effective management, the fundamental guarantee for improving economic efficiency and effective way.
最新问答: 图书室有文艺书x本,故事书比文艺书的3.2倍还多60本. 碘水加入硫酸亚铁再加入硫氰化铵的化学方程式 选择单词适当的形式填空spend enjoy easy money air climb free road1、Jim u “我希望你永远保持微笑”这句话用英语怎么说 取0.04molKMnO4固体加热一段时间后,收集到a mol单质气体,此时KMnO4的分解率为x,在反应后的残留固体中 六年级英语上册13课为什么Mum大写 去年秋季以来,我市某镇遭受百年一遇的特大旱灾,为支援该镇抗旱,上级下达专项抗旱资金80万元用于打井, 英语翻译“曲线突然下降然后再回升”谢谢! “大雨落幽燕”中的“燕”读几声? 小刚和小强在争论一道几何题,问题是射击时为什么枪管上有准星.小刚说:"这还不简单,老师上课不是讲过了 dining hall怎么读 若(x+2)(x-1)能整除2x的4次方-4x的3次方+ax的2次方+7x+b,试求a、b的值. 已知函数f(x)=a-1/2∧x+1,若f(x)为奇函数,求a值;求证;不论a为何实数f(x)总为增函数 叶绿体中色素的提取和分离中酒精起什么作用 求一篇关于照片的作文老照片的故事 一个长方体的高减少2厘米后成为一个正方体,那么表面积就减少48平方厘米,这个正方体的体积是( )立方厘米. 2013佛山一模化学.32.(14分)废旧电池进入环境后,对人体带来一系列的致畸、致癌、致变等危害.废电池中主要有铜帽( 我的小伙伴作文(事例而已3个哟)谢谢咯 地壳中微量元素的排序表就是铁,硅等等元素!养闺女 贴给哪家美 小明家5月份用电250千瓦时,其中用“峰电”150千瓦时,用谷电100千瓦时.请计算他们家使用峰电电价
相关问答: 跪求